







1. On-site survey, remote video survey or corresponding on-site photos provided by the customer 2. Design drawings (including floor plans, effect drawings, construction drawings), and determine the design plan 3. Equipment customized production 4. Equipment transportation and entering the construction site 5. Pipeline embedded construction,Equipment room installation 6. The overall construction is completed, and the whole swimming pool system commissioning and delivery





















